题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2024-03-17 18:02:48

[单项选择]A customer wants to create a 1:1 protection group with a DS3N-12 card. Which card slots would allow for a 1:1 protection?()
A. Slot 2 and Slot 4
B. Slot 4 and Slot 6
C. Slots 5 or 13 only
D. Slot 16 and Slot 17

更多"A customer wants to create a 1:1 pr"的相关试题:

[多项选择]A customer wants to create a custom Junos Pulse configuration. Which two are required?()
A. Connection set
B. Configuration set
C. Custom installer
D. Component set
[单项选择]Which statement is true for a customer that wants to deploy compression for a circuit rated at 155 Mbps?()
A. A WX60 cluster can handle 155 Mbps.
B. WX devices can handle only up to 45 Mbps.
C. Only a WXC500 or WXC590 can handle this requirement.
D. A WXC or WX stack configuration deployment is required.
[单项选择] customer wants to network several computers within a large warehouse. The warehouse has one computer at the very far end of the warehouse that is 170 meters (557 feet) from the network switch. Which of the following cable types should a technician use for this computer?()
A. CAT3
B. CAT5
C. CAT6
D. Fiber
[单项选择] A customer wants to install data deduplication and is currently backing up 100 MB of data per night and 300 MB of data per week. They require 100mb/sec of throughput to achieve this backup in their backup window. They have very limited rack space and can only offer 4U space in one of their existing racks. Which ProtecTIER product set best suits this customer?()
A. TS3500
B. TS7610
C. TS7650G
D. TS7650A
[单项选择] A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()
A. add one SVC
B. install one DS8700
C. install one DS8800
D. install one XIV system
[单项选择]A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()
A. disaster recovery strategy
B. the number of IOPS required
C. the capacity of each hard drive
D. how the database will be backed up
[单项选择]Which command will create a group called ‘delivery’and set the administrators to john’ and ‘mary’?()
A. mkgroup -A=john,mary delivery
B. groupadd -A=john,mary delivery
C. mkgroup adms=john,mary delivery
D. groupadd adms=john,mary delivery
[单项选择]A customer wants to create backups at a remotely located datacenter.  Price and performance are of primary importance, so backup to disks at the remote location is selected instead of tape.  The remote location is 1 KM (0.6 Miles) away from the data center.  NAS is the solution being considered.  Which of the following is the benefit of this solution?()
A. NAS runs on 2Gb fibre, which will provide better performance.
B. NAS uses WAN infrastructure, which can easily span the 1 KM gap.
C. NAS requires fibre storage, which allows dual paths for redundancy.
D. NAS requires iSCSI routers and offers better growth environment.
[单项选择]A customer wants to check whether they have the necessary tools enabled to prevent intrusions andvirus attacks on a Windows Vista workstation. Which of the following tools can be used to display thecurrent configuration? ()
A. Security Center
B. Event Viewer Security log
C. Windows Defender
D. Windows Firewall
[单项选择]A customer wants to know what version of DirectX the current workstation has installed. Which of the following command line tools would the customer use?()
A. edit
B. systeminfo
C. gpedit.msc
D. dxdiag
[多项选择]Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)
A. no single point of failure
B. trading database server location
C. redundant application servers location
D. deterministic response to all failures
E. determine which protocol to use
[单项选择]If a customer wants a quick settlement of his or her problem, it's better to complain to ______.
A. the store manager
B. a shop assistant
C. the producer
D. a public organization
[单项选择] A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
A. A VIO server requires a dedicated LHEA port.
B. There is a limit of 32 LPARs per virtual LAN.
C. Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
D. Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
[单项选择]A technician wants to create a spanned volume on a set of hard drives. Which of the following tools will identify if the drives will support a spanned volume?()
A. System Information
B. Disk Management
C. Device Manager
D. Task Manager
[单项选择] A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server on a high end disk subsystem. The customer does not have a SAN installed. The customer will require approximately 24 TB of capacity for System p and 20 TB of capacity for System i. The customer states that performance of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers.  Which solution best satisfies the customer requirements()
A. IBM DS8700 with 600 GB drives for the System p, 300 GB/15k drives for Systemi; and advanced functions for System p capacity
B. IBM DS8700 with LPAR, 300 GB/15k drives and RAID 10 for Systemi; and 600GB drives with RAID 5 and advanced functions for System p capacity
C. IBM DS8700 with advanced functions, 300 GB/15k drives and RAID 10 for Systemi performance; and 600 GB drives and RAID 5 for System p capacity
D. IBM DS5100 with Enhanced Remote Mirror, 600GB/15k drives and RAID 5 for System p; and 300GB/15k drives and RAID 10 for Systemi
[单项选择] A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()
A. The Blades must use the same CIOv and CFFh expansion adapter types.
B. Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86  Blades.
C. The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades  are in bays 1-7 and the x86 Blades are in slots 8-14.
D. The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
[单项选择] A customer wants to configure two resource groups and create the following shared filesystem structure:Resource GroupFilsystem Mount Point Rg1/app1 Rg2/app1/data Which of the following will ensure the proper mount order for these filesystems?()
A. Set filesystem recovery method to parallel
B. Set filesystem recovery method to sequential
C. Set filesystem recovery method to parallel and configure a parent/child relationship for the resourcegroups
D. Set filesystem recovery method to sequential and configure a parent/child relationship for the resourcegroups

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码