题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-10-20 10:52:50

[单项选择] A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
A. A VIO server requires a dedicated LHEA port.
B. There is a limit of 32 LPARs per virtual LAN.
C. Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
D. Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

更多"A customer needs to create a number"的相关试题:

[单项选择] A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
A. A VIO server requires a dedicated LHEA port.
B. There is a limit of 32 LPARs per virtual LAN.
C. Two VIO servers will be required. A single VIO server can only provide virtual storage or Virtual Ethernet.
D. Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
[单项选择]A customer, Bob, needs to be able to access the Internet while traveling. Which of the following could Jill, a technician, recommend to Bob?()
A. Cellular service with an adapter for Bob’s laptop.
B. USB adapter with 802.11n capabilities for maximum speeds.
C. A Bluetooth card to attach to multiple networks.
D. Enable Wi-Fi so Bob can connect to any open network.
[单项选择] A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment. What IBM solution should be recommended to this customer?()
A. Metro Mirror
B. Metro/Global Mirror
C. Geographically Dispersed Open Servers (GDOS)
D. Geographically Dispersed ParallelSysplex (GDPS)
[多项选择]Which three customer needs are addressed by Cisco solutions?()
A. reducing day one costs
B. improving productivity
C. gaining competitive advantage
D. focusing on current needs
E. obtainingA wide variety of point products
F. reducing TCO
[单项选择] A potential new customer needs servers and requests a response to their hardware specifications, which are all related to hardware speeds, disk, and memory configuration. The customer requests a quote within 48 hours.  Which of the following should the System x Sales Specialist do to MAXIMIZE the odds of winning this business? ()
A. Request an extension because 48 hours will not be enough time to propose an appropriate solution.
B. Ask the customer for a call to learn more about their needs and respond to their request with a complete solution.
C. Use the configuration guide or spreadsheet configurator to assemble server configurations that meet the specification, and then look for the lowest price.
D. Contact the IBM Client Representative for this account and ask for assistance in setting up a meeting with the technical decision maker of the prospective customer.
[多项选择]A customer wants to create a custom Junos Pulse configuration. Which two are required?()
A. Connection set
B. Configuration set
C. Custom installer
D. Component set
[单项选择] A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()
A. PowerHA SystemMirror
B. Peer to Peer Remote Copy
C. General Parallel File Systems
D. Parallel Operating Environment
[多项选择] A customer needs to analyze an application that was developed for Oracle Application Server 10gR2 or 10gR3 (OC4J) in order to prepare to upgrade the infrastructure to WebLogic 12c. The customer wants understand the changes required to be made to the application and how to configure WebLogic in to support the newly upgraded application.    Which three actions would you recommend for upgrading the customer's application and server configuration?()
A. Use Oracle Upgrade Manager to create a new WebLogic domain template from an OAS/OC4J  installation and redeploy the application.  
B. Use SmartUpgrade to analyze the OAS/OC4J server configuration and create WebLogic  configuration files.  
C. Use SmartUpgrade to analyze the application archive (EAR/WAR/JAR) Source Directory or IDeveloper project and generate a report that describes the areas of the application that need to be updated.  
D. Use the Configuration Wizard to extend an existing WebLogic domain with OAS/OC4J support  libraries and redeploy the application.  
E. Use SmartUpgrade to generate application artifacts and deployment descriptors that can be deployed to WebLogic.
[单项选择] A customer needs a remote data copy, data migration, and off-site backup solution. The solution cannot impact application performance. The sites are over continental distances.  Which  characteristic of DS8700 Global Mirror makes it a good fit for this customer()
A. it provides synchronous mirroring on both sides
B. it can be implemented withoutFlashCopy volumes at the target site
C. with Global Mirror, the Metro Mirror functions can be used over continental distances
D. it has almost no impact on application performance because of its extremely short and adjustable coordination time
[单项选择] A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()
A. I/O Planning Guide
B. Power Systems data sheet
C. Power Systems Facts and Features
D. Run FLRT to recommend I/O features
[单项选择] A customer needs to ensure that the number of threads servicing an application does not exceed the number of database connections available to the application. What step must you take to address this situation?()
A. Configure a Max Threads Constraint and add your application to the list of applications for the  Constraint.
B. Configure a Work Manager with a Maximum Threads Constraint tied to the Connection Pool and  configuration your application to use the Work Manager.
C. Configure a Work Manager with a Minimum Threads Constraint tied to the Connection Pool and  configure your application to use the Work Manager.
D. Configure a global MaxThreads constraint and target it to the server or clusters where your  application is deployed.
E. Configure the startup parameter "-Dwls-maxThreads" to be the same as the number of  database connections configured.
[单项选择]A customer wants to create a 1:1 protection group with a DS3N-12 card. Which card slots would allow for a 1:1 protection?()
A. Slot 2 and Slot 4
B. Slot 4 and Slot 6
C. Slots 5 or 13 only
D. Slot 16 and Slot 17
[单项选择]A customer needs to run 3 virtual machines on their software design workstation. Which of thefollowing CPUs would be MOST cost effective for this task?()
A. 3Core
B. 4Core
C. 8Core
D. 12Core
[单项选择] A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()
A. An IBM BladeCenter H chassis for the JS22 Blade servers
B. A concurrent KVM daughter card
C. A pair of IBM BladeCenter Power Supplies
D. A second Management Module
[单项选择] A customer needs 40 TB for Tier 2 Information Lifecycle Management (ILM) data installed on the System z/VM. Their current data center is critically short of floor space.  Which of the following would satisfy the customer requirement()
A. a DS5300 withFibre Channel drives 
B. an XIV with 15 modules of 1 TB drives 
C. a DS5100 with 2 TB SATA drives
D. an XIV with 6 modules of 1 TB drives
[单项选择]A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()
A. z/OS, DS8000, TSM
B. TSM, LTO-5, VMware
C. System x, VMware, XIV
D. System p, VMware, DS5000
[单项选择]A customer needs approximately 24 TB of RAW storage for some media files. SATA or nearline SAS drives are the obvious choice but rack space and budget are dominating factors. Which of thefollowing choices would be the best solution for this customer?()
A.  N6210 with 12 2 TB SATA drives 
B.  DS5020 with 24 1 TB SATA drives 
C.  Storwize V7000 with 24 1 TB SATA drives 
D.  DS3500 with 12 2 TB nearline SAS drives

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码