更多"()will the discharging operations t"的相关试题:
[单项选择]()will the discharging operations take?
A. How long
B. How length
C. How many times
D. How many shift
[单项选择]During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().
A. 150 millimeters of water pressure
B. 125 millimeters of water pressure
C. 100 millimeters of water pressure
D. 75 millimeters of water pressure
[单项选择]When discharging bilge water, which criteria must be observed?()
A. The requirement for the oil content of bilge water discharged is 15 ppm
B. No discharge in sensitive waters
C. Any discharge in sensitive waters
D. International, national or local requirements have to be observed
[单项选择]During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.
A. ship owner
B. ship's officers
C. shippers
D. consignors
[单项选择]When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
A. Should not exceed
B. Must be up to
C. Should exceed
D. Should be about
[单项选择]When discharging an oil cargo,the first consideration is to().
A. get the bow up
B. discharge from the wings first
C. discharge from the centerline tanks first
D. discharge from amidships first
[单项选择]When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
A. Draft and trim
B. Limits of the bending moments
C. Rate of discharging
D. Rate of loading
[单项选择]During loading or discharging,the tallymen must make contact with()on duty so as to solve problems in time.
A. ship owner
B. ship’s officers
C. shippers
D. consignors
[单项选择]You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take? ()
A. Cut in another IG fan to increase gas flow
B. Open the pressure control valve until the pressure increases
C. Open the tank isolation valve to the fully open position
D. Reduce the pumping rate
[单项选择]Upon arrival at the discharging port, the inert gas system is().
A. turned on
B. turning on
C. turn on
D. to turn on
[单项选择]When loading or discharging dry mud or cement,crew members should use goggles and().
A. facial respirator mask
B. ear plugs
C. rubberized boots
D. fireman's outfit
[单项选择]Upon arrival at the discharging port,the inert gas system is().
A. turned on
B. turning on
C. turn on
D. to turn on
[单项选择]During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
A. precluded
B. included
C. excluded
D. diluted
[单项选择](),you can’t finish discharging tomorrow!
A. What pity
B. What a pity
C. What the pity
D. What pities
[单项选择]These weights are()the ship’s discharging facilities.
A. out
B. beyond
C. from
D. off
[单项选择]The oil () in the discharging water from oil water separator exceeds 15 PPM without alarm, because the coil was burnt out.
A. filter
B. hole
C. pollution
D. content
[单项选择]The time of discharging oil is short, but oily water separator discharges oil frequentlyThe possible reason is ()
A. the sensor of low oil level is fully covered by sludge
B. the coarse strainer before the pump in suction system is clogged
C. the screw pump is worn seriously and volumetric efficiency is decreased
D. bilge suction value is clogged