更多"During loading or discharging,where"的相关试题:
[单项选择]During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().
A. 150 millimeters of water pressure
B. 125 millimeters of water pressure
C. 100 millimeters of water pressure
D. 75 millimeters of water pressure
[单项选择]During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.
A. ship owner
B. ship's officers
C. shippers
D. consignors
[单项选择]During loading or discharging,the tallymen must make contact with()on duty so as to solve problems in time.
A. ship owner
B. ship’s officers
C. shippers
D. consignors
[单项选择]When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
A. Draft and trim
B. Limits of the bending moments
C. Rate of discharging
D. Rate of loading
[单项选择]When loading or discharging dry mud or cement,crew members should use goggles and().
A. facial respirator mask
B. ear plugs
C. rubberized boots
D. fireman's outfit
[单项选择]During the watch at sea, where situations occur in the machine apace which may affect the speed maneuverability, power supply or other essentials for the safe operation of the ship()should be informed as soon as possible.
A. the chief engineer
B. the master
C. the bridge
D. the company superintendent
[单项选择]Where a period is fixed during which freight is to be paid,the Shipowner must()to deliver the goods throughout the whole of that period if he wishes to claim payment.
A. be had
B. be made
C. be prepared
D. be delivered
[单项选择]The longer the ignition delay period occurs in a diesel engine, the ().
A. less fuel will enter the cylinder
B. lower will be cylinder compression temperatures
C. more complete will be fuel combustion
D. more rapid will be the rise in combustion pressure
[单项选择]The longer the ignition delay period resulting from improper use of low cetane fuel, the ()
A. less fuel will enter the cylinder
B. higher the cylinder combustion temperature
C. more complete the fuel combustion
D. more rapid the rise in combustion pressure
[单项选择]Should the Buyers of the vessel cause undue delay they shall()for the losses thereby incurred.
A. not indemnify the Buyers
B. indemnify the Buyers
C. not compensate the Sellers
D. compensate the Sellers
[单项选择]I must apologize to you for the delay.()
A. That's all right.
B. No trouble at all.
C. All the best.
D. You are welcome.
[单项选择]No()payable for loss resulting from delay or delivery unless a notice has been given in writing to the carrier within 60 consecutive days after the day the goods were handed over to the consignee.
A. is compensation
B. are compensation
C. compensation is
D. compensation are
[单项选择]At any rate ()is liable for delay in obtaining the necessary Customs House papers for discharging,when the delay arises from the fact that special papers are required for the particular cargo carried.
A. the Charterer
B. the Shipowner
C. the Shipper
D. the Receiver
[多项选择]VoLT EMonth-to-ear delay主要包括()。
A. 应用延时
B. 传输延时
C. 空口延时
D. Internet延时
[单项选择]During compressors running the accumulated moisture in the separators must be ().
A. drained off
B. collected
C. sent to the crankcases
D. separated with oil
[单项选择]A port is()if the delay in leaving it would be such as to frustrate the adventure.
A. not good
B. unsafe
C. safe
D. obtainable
[单项选择]Weight is considered during the periodic required inspection and servicing of().
A. CO2 (carbon dioxide) fire extinguishers
B. foam fire extinguishers
C. water (stored pressure) fire extinguishers
D. All of the above