更多"When planning the loading or discha"的相关试题:
[单项选择]When loading or discharging dry mud or cement,crew members should use goggles and().
A. facial respirator mask
B. ear plugs
C. rubberized boots
D. fireman's outfit
[单项选择]During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().
A. 150 millimeters of water pressure
B. 125 millimeters of water pressure
C. 100 millimeters of water pressure
D. 75 millimeters of water pressure
[单项选择]During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.
A. ship owner
B. ship's officers
C. shippers
D. consignors
[单项选择]During loading or discharging,the tallymen must make contact with()on duty so as to solve problems in time.
A. ship owner
B. ship’s officers
C. shippers
D. consignors
[单项选择]During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
A. precluded
B. included
C. excluded
D. diluted
[单项选择]When discharging bilge water, which criteria must be observed?()
A. The requirement for the oil content of bilge water discharged is 15 ppm
B. No discharge in sensitive waters
C. Any discharge in sensitive waters
D. International, national or local requirements have to be observed
[单项选择]When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
A. Should not exceed
B. Must be up to
C. Should exceed
D. Should be about
[单项选择]When discharging an oil cargo,the first consideration is to().
A. get the bow up
B. discharge from the wings first
C. discharge from the centerline tanks first
D. discharge from amidships first
[单项选择]When loading containers into the cell guides in the hold of a container ship,which statement is TRUE?().
A. No further securing is usually required
B. Containers must have vertical lashings if they do not have twist lock securing
C. All containers must have vertical and horizontal lashings
D. The container must be locked into the cell guide
[单项选择]When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().
A. provide the proper trim
B. prevent negative stability from developing
C. prevent excessive longitudinal stresses
D. control list
[单项选择]When loading or unloading baled cargo on board,the straps()to lift or drag the bales.
A. are forbidden
B. are allowed
C. can be used
D. are usually used
[单项选择]When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading containers are port of discharge,().
A. available dunnage,and chocking
B. crushability,and inherent vice
C. sweat,and weight
D. weight,and refrigeration
[单项选择]What is not usually a concern when loading a single-hulled tanker?()
A. Bending moments
B. Initial stability
C. Draft
D. Trim
[单项选择]What is NOT a problem area when loading barges on a LASH type vessel? ()
A. Frequent stability calculations required
B. Thorough pre-planning required
C. Limiting depths alongside berths restrict barge drafts
D. Minimum trim and 0°list are required for optimum operations
[单项选择]When off loading garbage to another ship, your records must identify that ship by name and ()
A. home port
B. operators name of record
C. official number
D. masters name
[单项选择]When loading bulk liquid cargo,what is the FIRST action you should take if a cargo valve jammed open?()
A. Trip the pump relief valve
B. Order the dock man to shut down
C. Call the owner,operator,or terminal supervisor
D. Run out the vessel's or terminal's fire hose
[单项选择]When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?()
A. Call the owner,operator,or terminal supervisor
B. Unplug the deck scuppers
C. Order the dock man to shut down
D. Run out the vessel's or terminal's fire hose
[单项选择]()will the discharging operations take?
A. How long
B. How length
C. How many times
D. How many shift