更多"The longer the ignition delay perio"的相关试题:
[单项选择]The longer the ignition delay period occurs in a diesel engine, the ().
A. less fuel will enter the cylinder
B. lower will be cylinder compression temperatures
C. more complete will be fuel combustion
D. more rapid will be the rise in combustion pressure
[单项选择]Which shipboard equipment will detect a signal from a SART?()
A. S-Band Radar
B. A DSC receiver
C. X-Band Radar
D. The autoalarm
[单项选择]Under normal conditions a liferaft is released from itscradle by().
A. cutting the restraining strap
B. unscrewing the turnbuckle on the back of the cradle
C. lifting one end of the raft
D. pushing the plunger on the center of the hydrostatic release
[单项选择]If you notice smoke coming fro the crankcase exhaust fan outlet of an operating diesel engine, you would suspect()
A. a cracked cylinder liner
B. clogged intake ports
C. broken piston rings
D. a faulty head gasket
[单项选择]Under what condition are you allowed to depart from the rules of the road().
A. To avoid immediate danger
B. When authorized by the rig superintendent
C. To comply with an operator's requirement
D. Under no conditions
[单项选择]The legend/symbol which designates an occluded front is represented by a().
A. red line
B. purple line
C. blue line
D. dashed blue line
[单项选择]The order to enter the lifeboats will be given from the().
A. bridge
B. forward station
C. aft station
D. any hold in which the stevedores are working
[单项选择]What would most likely prevent a SART’s signal from being detected?()
A. Signal absorption by the ionosphere
B. Heavy sea swells
C. The rescue personnel were monitoring the 10-cm radar
D. The rescue personnel were monitoring the 3-cm radar
[单项选择]If a vessel takes a sudden severe list or trim from an unknown cause,you should FIRST().
A. determine the cause before taking countermeasures
B. assume the shift is due to off-center loading
C. counterflood on the side opposite the list or trim
D. assume the cause is environmental forces
[单项选择]Voltage generated by most AC generators is fed from the machine to the bus by means of().
A. brushes on a commutator
B. brushes on slip rings
C. slip rings on a commutator
D. direct connections from the stator
[单项选择]Should the Buyers of the vessel cause undue delay they shall()for the losses thereby incurred.
A. not indemnify the Buyers
B. indemnify the Buyers
C. not compensate the Sellers
D. compensate the Sellers
[单项选择]During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
A. precluded
B. included
C. excluded
D. diluted
[单项选择]I must apologize to you for the delay.()
A. That's all right.
B. No trouble at all.
C. All the best.
D. You are welcome.
[单项选择]No()payable for loss resulting from delay or delivery unless a notice has been given in writing to the carrier within 60 consecutive days after the day the goods were handed over to the consignee.
A. is compensation
B. are compensation
C. compensation is
D. compensation are
[单项选择]The approval period for a shipboard Oil Pollution Emergency Plan expires after().
A. two years
B. three years
C. four years
D. five years