更多"[单选题]( )are those costs that cannot"的相关试题:
[单选题]()are?those?costs?that?cannot?be?directly?traced?to?a specific?project?and?therefore?will?be?accumulated?and allocated?equitably?over?multiple?projects?by?some?approved and?documented?accounting?procedure.
A.Direct costs
B.Operation costs
C.Indirect costs
D.Implement costs
[单选题]TR1、TR2和TR3通常分别由谁供电
A.1#发转换汇流条、2#转换汇流条和2#主汇流条.
B.1#主汇流条、1#转换汇流条和2#转换汇流条
C.1#转换汇流条、2#转换汇流条和2#转换汇流条
D.1#主汇流条、2#转换汇流条和2#主汇流条
[判断题]TRA方法,即作业风险评估方法,除识别出作业过程中各种风险因素外,还要评判出这些风险因素中的重大风险因素,并努力采取措施降低这些重大风险到可接受的范围内。
A.正确
B.错误
[单选题]Estimating schedule activity costs involves developing an approximation of the costs of theresources needed to complete each schedule activity. Cost estimating includes identifying andconsidering various costing alternatives. For example, in most application areas, additional workduring a design phase is widely held to have the potential for reducing the cost of the executionphase and product operations. The cost estimating process considers whether the expectedsavings can offset the cost of the
A.project scope statement
B.statement of work
C.project management plan
D.project policy
[单选题]The publishing house sponsored all the costs of the conference.
A.started
B.paid
C.organized
D.arranged
[单选题]( )Estimating current project costs by analogy with similar projects。
( )是以类似的项目进行类比估计当期项目的费用。
A.Top-down estimating
自上而下估算法
B.Parametric model method
参数模型法
A.Bottom-up estimation metho
B.从下向上的估计法
C.Computing Tool Aided Method
D.计算工具辅助的方法
[单选题]This car costs__the other one.
A.as much over
B.as much more as
C.as much to
D.as much as
[单选题]The two oil companies( )to cut costs.
A.mixed
B.mingled
C.merged
D.messed
[单选题]Man cannot exist without water.
A.expand
B.rise
C.live
D.quit
[单选题]These factors interact intimately and cannot be separated.
A.tensely
B.nearly
C.carefully
D.closely
[单选题]This book costs______that one.
A.twice more
B.twice more as
C.two times more as
D.twice as much as
[单选题]The original experiment cannot be exactly duplicated.
A.reproduced
B.invented
C.designed
D.reported