更多"A new Catalyst switch is connected "的相关试题:
[多项选择]You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()
A. The switch name must match the workgroup name of the local network.
B. The switch must be configured with an IP address and default gateway.
C. The remote workstations must have access to the management VLAN of the switch.
D. CDP must be enabled on the switch so that it can be located by other devices on the network.
[单项选择] You are bringing up a new Cisco Catalyst switch, and wish to connect it via a trunk to another switch from a different vendor, which uses the IEEE standard for the trunking method. When setting the encapsulation type on the trunk, what should you configure on the Cisco switch?()
A. Switch(config)# switchport trunk encapsulation isl
B. Switch(config)# switchport trunk encapsulation ietf
C. Switch(config-if)# switchport trunk encapsulation isl
D. Switch(config-if)# switchport trunk encapsulation ietf
E. Switch(config-if)# switchport trunk encapsulation dot1q
[多项选择] An administrator is configuring a Catalyst switch with VLAN information that must be automatically distributed to other Catalyst switches in the network. What conditions must be met in order for the VLANs configured on this switch to be automatically configured on the other switches?()
A. The switch that will share its VLAN configuration must be in VTP server mode.
B. The switches must be in the same VTP domain.
C. The switch that will share the VLAN information must be configured as the root bridge.
D. The switches must be connected over VLAN trunks.
E. The switches must be configured to use the same STP version.
F. The switches must have VTP pruning activated.
[单项选择] A Catalyst switch has just been installed and configured, and is not working as expected. You have decided to capture multiple show command outputs to study. Which one command could you use that includes the output of many other show commands, such as show version and show running-config?()
A. show configuration
B. show memory
C. show stacks
D. show tech-support
[单项选择]On a Cisco Catalyst switch, which configuration command is used to apply a VACL named "test"to filter the traffic within VLAN100? ()
A. interface vlan 100 ip access-group test
B. interface vlan 100 ip access-group test in
C. interface vlan 100 ip access-group test out
D. vlan filter test vlan-list 100
E. vlan access-map test 100
[单项选择]You want your Catalyst switch to implement a switching method that holds a packet in its memory until the data portion of the respected packet reaches the switch.Which method should you employ on your Catalyst switch?()
A. Fast Forward
B. Store and forward
C. Frag-free
D. None of the above
[单项选择] A Cisco Catalyst switch is part of the CIS network. As an experienced network administrator, you are thinking of filtering the traffic within VLANI00 with the use of a VACL named "test" on that switch. Which of the following command will enable that?()
A. interface vlan 100 ip access-group test in
B. interface vlan 100 ip access-group test
C. vlan access-map test 100
D. vlan filter test vlan-list 100
[单项选择]On the Catalyst 6500 Series switch, which command is used to establish a console connection to the Firewall Services Module?()
A. ssh
B. connect
C. login
D. session
[多项选择]By default, each port in a Cisco Catalyst switch is assigned to VLAN1. Which two recommendations are key to avoid unauthorized management access? ()
A. Create an additional ACL to block the access to VLAN 1.
B. Move the management VLAN to something other than default.
C. Move all ports to another VLAN and deactivate the default VLAN.
D. Limit the access in the switch using port security configuration.
E. Use static VLAN in trunks and access ports to restrict connections.
F. Shutdown all unused ports in the Catalyst switch.
[单项选择]A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()
A. All defined VLANs are allowed on the trunk by default.
B. Each VLAN, or VLAN range, that is specified with the switchport mode command.
C. Each VLAN, or VLAN range, that is specified with the vtp domain command.
D. Each VLAN, or VLAN range, that is specified with the vlan database command.
[单项选择]The Cisco Catalyst Express 500 Series Switch is targeted for businesses with how many users?()
A. 501 to 1000 Users
B. 20 to 250 Users
C. More than 1000 Users
D. 251 to 300 Users
[多项选择] When the Catalyst switch R1 is enabled to use VTP, which information does it advertise on its trunk ports?()
A. VTP mode
B. STP root status
C. Negotiation status
D. Management domain
E. Configuration revision number
[单项选择]A Cisco Catalyst switch can belong to how many VTP domains? ()
A. 1
B. 2
C. 1 to 1,005
D. 1 to 4,096
E. no limit
[多项选择]You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?()
A. The TESTKING VLAN must be created.
B. The desired ports must be added to the new TESTKING VLAN.
C. The TESTKING VLAN must be added to all of the domains.
D. The TESTKING VLAN must be named.
E. An IP address must be configured for the TESTKING VLAN.
F. None of the above. VLAN creations are automatic.
[单项选择]A system administrator installed a new switch using a script to configure it. IP connectivity was tested using pings to SwitchB. Later attempts to access NewSwitch using Telnet from SwitchA failed. Which statement is true?()
A. Executing password recovery is required.
B. The virtual terminal lines are misconfigured.
C. Use Telnet to connect to RouterA and then to NewSwitch to correct the error.
D. Power cycle of NewSwitch will return it to a default configuration.
[多项选择] A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()
A. You must set each end of the trunk line to IEEE 802.1e encapsulation.
B. You must set the same VTP management domain name on both switches.
C. You must set all ports on the two switches as access ports.
D. You must configure one of the switches as a VTP server.
E. You must use a rollover cable to connect the two switches.