题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2024-08-22 01:26:45

[单选题]It’s normal to spend two or three years working in one’s own country before  working __·
A.

outside


B.

overseas


C.

at home


D.

inside

更多"[单选题]It’s normal to spend two or th"的相关试题:

[单选题]Exhibit.
The three VLANS shown provide connectivity to backend servers. The backend servers are being moved to unmanaged switches and require separate interfaces.
How should the F5 device interfaces be configured?
A. Create a Trunk interface and combined interface 1.1.1.2 and 1.3.
B. Create a Trunk interface and select VLAN„A, VLAN_B. and VLAN_
C.C. Create VLAN named VLAN_A enter 100 under Tag and move interface 1.1 to tagged Create VLAN_B enter 200 and move interface 1.2 to tagged Create VLAN_C Center 300 and move interface 1.3 to
Tagged.
D. Create VLAN_A move interface 1.1 to untagged. Create VLAN_B move interface 1.2 to untagged. Create VLAN_C move interface 1.3 to untagged.
[单选题]
Not until he retired from teaching three years ago ________ having holiday abroad.
A. he had considered
B. had he considered
C. he considered
D. did he consider
[单选题]The Chief Checker can speak three foreign languages _____,English, French and Japanese( )
A. namely
B. such as
C. for example
D. for instance
[单选题]Temporary changes of long duration (three months or longer) and information of short duration which contains extensive text and/or graphics shall be published as AIP Supplements.
A.有效期长(3个月或以上)的临时变更,或有效期短但篇幅大、图表多的资料,应当按照航空资料汇编进行公布。
B.有效期长(3个月或以上)的临时变更,或有效期短但篇幅大、图表多的资料,应当按照航空资料通报进行公布。
C.有效期长(3个月或以上)的临时变更,或有效期短但篇幅大、图表多的资料,应当按照航空资料汇编补充资料进行公布。
D.有效期长(3个月或以上)的临时变更,或有效期短但篇幅大、图表多的资料,应当按照航空资料进行公布。
[单选题]156
Not until he retired from teaching three years ago ________ having holiday abroad.
A.he had considered
B.had he considered
C.he considered
D.did he consider
[单选题]
Old Mr Black lives happily with his three dogs. ______ of them are part of his family.
A. Both
B. All
C. None
D. Neither
[单选题]The three students ——to help the disabled children at weekends.
A.

interrupt


B.

participate


C.

allow


D.

volunteer

[单选题]If one of the three RVR reporting systems has failed, a take-off is authorized,provided the remaining two RVR values are at or above the appropriate take-off minimums.
A.三个跑道视程报告系统中如果有两个出现故障,只要其他一个跑道视程值低于相应的起飞最低标准,也能允许起飞。。
B.三个跑道视程报告系统中如果有两个出现故障,而其他一个跑道视程值不低于相应的起飞最低标准,也能允许起飞。。
C.三个跑道视程报告系统中如果有一个出现故障,而其他两个跑道视程值不低于相应的起飞最低标准,也不允许起飞。。
D.三个跑道视程报告系统中如果有一个出现故障,只要其他两个跑道视程值不低于相应的起飞最低标准,也能允许起飞。
[单选题]13
Old Mr Black lives happily with his three dogs. ______ of them are part of his family.
A.Both
B.All
C.None
D.Neither
[单选题]. How many years passed between her graduation from medical school and the opening of her hospital?
A. Eight years
B. Ten years
C. Nineteen years
D. Thirty-six years
[单选题]The small country was destroyed by ten years of ____ fighting.
A.

impressive


B.

active


C.

slim


D.

bitter

[单选题] It can take up three months to ( ) a man to do this work!
A. guide
B. raise
C. train
D. learn
[单选题]23
--Three-D printing technology could be used to build a house in less than 24 hours. --It _____ amazing.It’s my first time to get to know the news.
A.looks
B.smells
C.sounds
D.tastes
[单选题]Please ____ a space three feet wide for walking. ( )
A. let
B. put
C. leave
D. make
[单选题]S1:Chief, this is captain. We will take three tugs. Two tugs will pull, and one tug
Will push. Stand by for making fast the tugs. S2:Captain, this is chief mate. Standing by. S1:Chief. Use the fairlead on port bow. Send heaving lines to the tugs. S2:Heaving lines being sent to the tugs now. Captain. S1:Send two towing lines to the tugs. S2: Two towing lines being sent to the tugs. Captain. S1:Make fast the forward tugs on port bow, and the aft tug on the starboard quarter. S2:Tugs fore and aft are made fast now. Captain. S1:Chief mate. Put the eyes of the towing lines on bitts. S2:Captain. Towing lines are on bitts now. We are standing by for letting go the tugs. 1: What are they doing?
A. They are trying to refloat.
B. They are preparing for taking tugs.
C. They are abandoning vessel.
D. They are piloting the vessel
[单选题]Two LTM devices must be manually configured to restrict in the same Device Group. What is the correct order of steps to meet this requirement?
A. Configure VLAN, Configure-Sync IP, Configure Failover type, Establish Device Trust, Sync Device Trust, Create type, Establish Device Sync Device Trust, Create Device Group.
B. Configure VLAN, Configure Self-IPs, Configure Config-Sync IP. Configure Failover type, Establish Device Trust, Sync Device Trust, Create Device Group.
C. Configure Self-IPs, Configure VLAN, Configure Config-Sync IP. Configure Failover type, Establish Device Trust, Sync Device Trust, Create Device Group
D. Configure VLAN, Configure Config-Sync IP. Configure Self-IPs. Configure Failover type. Establish Device Trust, Create Device Group

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码