[单项选择]()does not belong to the mooring trial item.
A. generator sets running trial
B. shafting intensity trial
C. the trail for pumps that working for ME
D. ME safety devices trial

更多"()does not belong to the mooring tr"的相关试题:

[单项选择]When carrying out mooring trial, the () trial of the MEis not necessary.
A. starting
B. torsion vibration
C. direction changing
D. running
[单项选择]When carrying out mooring trial, if the M√Ecan’t start normally, you should ()
A. take a further inspection in the voyage
B. check and repair, then retrial
C. do as the surveyor’s requirement
D. retrial
[单项选择]Which of the followings does not belong to main maneuvering facilities?()
A. rudder
B. propeller
C. radar
D. sider thruster
[单项选择]In the constant-tension mooring, the mooring lines holding the ship to the pier will maintain a constant tension even with changes in tide or ship’s draft, ().
A. without the necessity of manually adjusting the lines
B. without the necessity of automatically adjusting the lines
C. with the necessity of manually adjusting the lines
D. with the un-necessity of automatically adjusting the lines
[单项选择]()ready for mooring.
A. Do
B. Make
C. Get
D. Got
[单项选择]Get everything ready()mooring.
A. of
B. on
C. to
D. for
[单项选择]The majority of automatic mooring winches are spur geared to improve the backward efficiency of the gear train for rendering()
A. spur geared
B. screw geared
C. worm geared
D. belt driven
[单项选择]The spur geared mooring winches have advantages over worm geared ones in()
A. higher efficiency of the gear train while reversing
B. the higher gear ratio
C. the multi-start feature
D. higher recovering speed
[单项选择]Connecting elements of a mooring system should be fabricated from().
A. cast iron
B. forged steel
C. stainless steel
D. cast steel
[单项选择]These include deck machinery such as mooring equipment, anchor handling equipment, cranes and ().
A. boilers
B. bow thrusters
C. stabilizers
D. hatch covers
[单项选择]Installing tandem anchors on the same mooring line is referred to as().
A. doubling
B. pretensioning
C. piggybacking
D. paralleling
[单项选择]Mooring lines both()were let go.
A. for and aft
B. from and aft
C. fore and aft
D. all and aft
[单项选择]You are handling a mooring line and are instructed to Check the line.What should you do().
A. Ensure the bight is not fouled by taking up slack
B. Pay out the line smartly and keep it free for running
C. Secure the line by adding more turns
D. Surge the line so it maintains a strain without parting
[单项选择]Which mooring line prevents sideways motion of a vessel moored to a pier().
A. A line led forward from the bow
B. A line led aft from the bow
C. A line led in the same direction as the keel
D. A line led at a right angle to the keel
[单项选择]Survival practice in the mooring system is to slack off the tensions on the leeward side and().
A. deballast the unit to transit draft
B. adjust as evenly as practical the windward tensions
C. release the anchors on the windward side
D. tighten the anchor buoys on the leeward side anchors
[单项选择]Which method of adjusting mooring lines is MOST useful for leaving a boat free to rise and fall with the tide?()
A. Crossing the spring lines
B. Slacking all forward running lines while keeping all after running lines taut
C. Doubling up on spring or breast lines
D. Slacking bow and stern lines
[单项选择]The () belongs to the mooring equipment.
A. steering gear
B. windlass
C. deck crane
D. warping drum
[单项选择]A mooring line that prevents a vessel from moving sideways away from the dock is a().
A. bow line
B. breast line
C. stern line
D. spring line

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码