题目详情
当前位置:首页 > 职业技能鉴定考试 > 航海英语
题目详情:
发布时间:2023-10-13 17:55:37

[单项选择]Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.
A. the work of using lines and chains to secure the cargo on board
B. the lash work
C. the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitching
D. the lashing work

更多"Please kindly arrange for shore wor"的相关试题:

[单项选择]Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
A. lashing
B. shifting
C. lifting
D. tallying
[单项选择]Please collect all the shore-passes and hand them back () me.
A. for
B. with
C. to
D. of
[单项选择]Please arrnge for the workers to do the()work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.
A. lashing
B. shifting
C. lifting
D. tallying
[单项选择]Please()me how to do the market research for a new product.
A.  take
B.  have
C.  show
D.  give
[单项选择]Which statement describes the shore between Watch Hill Point and Point Judith? ()
A. Low,rocky cliffs with heavily wooded hills inland
B. Sandy beaches broken by rocky points
C. Sand dunes and beaches with a mud and sand bottom
D. Wooded,barren hills with isolated prominent buildings
[单项选择]A lot of old buildings in the town were ruined during the earthquake, but they were beautifully()soon by the local people.
A. recovered
B. restored
C. resumed
D. returned
[单项选择]They claimed that()1,000 factories closed down during the economic crisis.
A. sufficiently
B. approximately
C. considerably
D. properly
[单项选择]You are kindly requested to supply the necessary tallymen to do()on board the ship during the discharging of the cargo.
A. the tallying work
B. the lashing work
C. the clean work
D. the work of opening and closing hatches
[单项选择]Permission is kindly requested to()in celebration of our National Day.
A. dress my ship overall
B. raise my ship overall
C. hoist my ship overall
D. display my ship from stem to stern
[单项选择]Permission is kindly requested()the ballast water.
A. pump out
B. to pump out
C. pumping out
D. be pumped out
[单项选择]A breeches buoy is being rigged from the shore to a stranded vessel. The initial shot line passed to the vessel is normally made fast to a().
A. hawser which is used to pass a tail-block and whip to the vessel
B. hawser with breeches buoy and harness attached
C. hawser which should be made fast to the vessel below the intended location of the tail-block
D. tail-block and whip which may be used to pass a hawser to the vessel
[单项选择]Your vessel is taking on bunkers from a shore side facility, if oil begins flowing from one tank vent, which of the following actions should be taken FIRST?()
A. Open the intake valve to an adjacent tank
B. Set out drip pans and sawdust and begin to mop up the spill
C. Signal the shore control point to shutdown
D. Close the valve on the tank vent line
[单项选择]Shore power must be() during dock repair.
A. disconnected
B. switched off
C. cut off
D. connected
[单项选择]The movement of water away from the shore or downstream is called a(n)().
A. reversing current
B. ebb current
C. flood current
D. slack current
[单项选择]The term LEE SHORE refers to the().
A. shore on the lee side of the vessel
B. shore that is in the lee
C. western shore of the Lesser Antilles
D. shore in a harbor of refuge
[单项选择]If shore personnel are not permitted to work due to failure of the Owners to comply with the necessary regulations,or because of a lack of necessary certificates,any time so that lost to count as().
A. Demurrage
B. Despatch
C. Off-hire
D. Delay
[单项选择]Permission is kindly () about 1000 tons of clean sea water ballast,as and when required for trimming purposes.
A. requested to pump out
B. requested pumping out
C. requesting to pump out
D. requesting pumping out
[单项选择]The complying vessels can transmit ship-to-shore distress alerts by at least().
A. one means, whether satellite or terrestrial techniques
B. two means, whether satellite or terrestrial techniques
C. two separate and independent means, each using different radio communication services
D. two means, such as MF DSC and HF DSC

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码