题目详情
当前位置:首页 > 外语类考试 > 卫生类
题目详情:
发布时间:2023-10-13 07:58:37

[单项选择]The construction of the bridge goes on very well.
A. instruction
B. destruction
C. conduction
D. building

更多"The construction of the bridge goes"的相关试题:

[单项选择]Unfortunately, the bridge under construction clasped in the earthquake, so they had to do the whole thing again from scratch.
A. from the beginning
B. from now on
C. from time to time
D. from the bottom
[单项选择]From here, you can see the bridge ( ) construction.
A. in
B. on.
C. under
D. with
[单项选择]From here, we can see the bridge ()construction.
A. below
B. under
C. by
D. with
[单项选择]John goes in for tennis while his wife goes in for painting and sculpture.
A. outgrows
B. dedicates herself to
C. calls herself down
D. rakes after
[单项选择]Which is ______ bridge, Golden Gate Bridge or London Bridge
A. longer
B. the longer
C. a longer
D. a long
[单项选择]The Golden Gate Bridge is


A. 8450 feet long
B. more than 8450 feet with approaches excluded
C. more than 8450 feet with approaches included
D. 8450 feet long with approaches included
[单项选择]This bridge is () that one.
A. four times as long of
B. as four times as
C. four times as long as
D. long four times of
[单项选择]The government has decided to build another bridge ______ the Yangtse River,


A. above
B. over
C. across
[单项选择]During construction of the new apartment building next to ours, we cannot be held ______ for any damage from falling objects.
A. responsibility
B. responsible
C. responsibly
D. response
[单项选择]The construction might produce the following harmful effects EXCEPT ______.


[单项选择]Modern plastics can ()very high and very low temperatures.
A. stand
B. hold
C. carry
D. support
[单项选择]You are managing the construction of luxury condominiums in one of the last available plots of city land. On this project, the owner is focused on timely performance and has provided contract incentives that will reward you and your company if the job is complete early. However, the International Brotherhood of Commode Installs is ready to strike for higher wages, and an environmental group is concerned about adverse impacts on the full-breasted warbler resulting from the placement of satellite dishes on the balconies. On this project, you need to ().
A. find appropriate resolutions to resolve differences between or among stakeholders
B. put the owner's requirements at the top of the list as you resolve stakeholder differences
C. carefully manage all communication and make status information available only on a need-to-know basis
D. build the condominiums according to the specifications and not worry about any other stakeholder
[单项选择]The swimming pool is () construction.
A. in the process of
B. in the process for
C. on the process of
D. on the process for
[单项选择]JME Construction always uses the percentage of completion method of recognizing revenue. During 2004 JME signs a contract in the amount of $10 million with the following data available:()
A. 300000
B. 2200000
C. 8800000
[单项选择]According to the urban construction program old buildings that are ___________ should be pulled down.


A. under repair
B. out of repair
C. in repair
D. beyond repair
[单项选择]If the distribution of a construction is functionally equivalent to that of one or more of its constituents, the construction is called ______.


A. exocentric construction
B. endocentric construction
C. immediate construction
D. contributive construction

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码