第14题: [单项选择]{{B}}Questions 11 to 18 are based on the conversation you have just heard.{{/B}} A. He got angry with his boss B. He always got to work late C. He was frequently sick and absent from work D. He prepared a financial report incorrectly 参考答案:D 答案解析:[听力原文]
M: I was sorry to hear about Bill’s being fired. I know he was sick a lot and that he usuall
第15题: [单项选择]建设项目后评价所依据的资料,应由()负责提供。 A. 项目主管单位 B. 项目后评价单位 C. 项目业主单位 D. 项目生产使用单位 参考答案:A 答案解析:本题考核的是项目主管单位的职责。项目主管单位将评价要求事项通知被评价项目业主及主要参建单位,要求做好相关准备,积极配合现场调查,并按要求提供被评价项目的相关文件资料。
A. both their watches were good B. neither of their watches could tell the correct time C. there was something wrong with the German watch D. there was nothing wrong with the Japanese watch 参考答案:B 答案解析:[考点] 细节题 [解析] 从文章第二段第一句They could see there was something wrong with both watches.得知,实验后两只表都不能确定准