题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-11-15 00:21:52

[单项选择] A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited. What hardware platform provides this native support?()
A. IBM XIV Storage System
B. IBM System Storage DS5300
C. IBM System Storage DS8800
D. IBM System Storage DS5020 with SVC

更多"A bank has requested proposals for "的相关试题:

[单项选择] A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be used.  Which solution best meets the specified requirements()
A. two DS8700 systems with two-way processor cards and 600 GB FC drives
B. two DS8700 systems with four-way processor cards and LPAR
C. two DS8700 systems with two-way processor cards and two frames per system
D. two DS8700 systems with four-way processor cards and two frames per system
[单项选择]If the negotiating bank has negotiated a credit confirmed by itself, it will ______.
A. be able to claim repayment from the beneficiary of the advance which is not ultimately forthcoming from the issuing bank
B. not be able to claim repayment from the beneficiary of the advance which is not ultimately forthcoming from the issuing trunk, provided the terms of the credit have been complied with
C. be able to claim repayment from the beneficiary of the interest which is net ultimately forthcoming from the issuing bank
D. not be able to obtain reimbursement from file issuing bank
[单项选择]Organizing and operating the bank has taught the children a lot about the banking business.这句话的中文意思是()
A.  银行业务包含如何教授孩子们管理和经营。
B.  管理和经营银行使孩子们学到了很多有关银行业务的知识。 
C.  孩子们把所学的银行知识应用在管理和经营银行。
[单项选择]One of the obligations a bank has to a customer ______. ( )
[单项选择]A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()
A. 0
B. 1
C. 2
D. 4
[单项选择] A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance. Which of the following actions should be recommended as a first step?()
A. install the Performance Accelerator feature
B. review the DS Storage Manager Major Event Log (MEL)
C. add an expansion frame with additionalFibre Channel ports
D. review the latest TPC for Disk study to identify the source of the performance issue
[单项选择]Technology has () the sharing, storage and delivery of information, thus making more information available to more people.
A. finished
B. furnished
C. functioned
D. facilitated
[单项选择] A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()
A. bring up the secondary site on the target disks
B. suspend and bring up the secondary site on the target disks
C. perform a FlashCopy and bring up the secondary site on the target disks
D. "go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks
[单项选择] A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()
A. Global Copy
B. Metro Mirror
C. Global Mirror
D. Metro/Global Mirror
[单项选择]The concern (has been) that the embryo bank (might be) exploited (by unscrupulous), or that conception might precede birth by nine or even ninety years, (rather than) by nine months.
A. has been
B. might be
C. by unscrupulous
D. rather than
[单项选择]A bank has requested proposals for a storage solution to upgrade their disaster recoveryprocesses for their System z, UNIX, and Microsoft Windows environment. The solution mustsimulate a multi-site environment and provide the customer the ability to explore Metro Mirror,Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution bestmeets the specified requirements?()
A. Two IBM System Storage DS8100 systems
B. One IBM System Storage DS8300 with two LPARs
C. Two IBM System Storage DS6800 systems in a single rack
D. One IBM System Storage DS6800 for System z, and SVC for UNIX and Windows
[单项选择]The storage specialist has designed a very complex solution with the customer, and needs toverify that all associated equipment will work as expected. Which of the following is designed tohelp lower support cost and improve customer satisfaction?()
A. ATScon Monitor
B. Technical and Delivery Assessment
C. System Storage Interoperations Center
D. Standalone Solutions Configuration Tool
[单项选择] A customer has a storage requirement for a mixed IBM Power AIX and System z environment. They require approximately 3 TB of high performance disk for their System z environment. They require approximately 32 TB of low-performance disk for their System p environment. The storage specialist is using Capacity Magic to configure an IBM DS8700.  Which configuration is most appropriate for this customer()
A. 2 x 300 GB 15k rpm disk drive sets for System z; and 4 x 2 TB 7.2k rpm disk drive sets for Power AIX
B. 4 x 146 GB 15k rpm disk drive sets for System z; and 4 x 2 TB 7.2k rpm disk drive sets for Power AIX
C. 2 x 300 GB 10k rpm disk drive sets for System z; and 4 x 300 GB 15k rpm disk drive sets for Power AIX
D. 2 x 300 GB 15k rpm disk drive sets for System z; and 2 x 1 TB 7.2k rpm disk drive sets for Power AIX
[单项选择] A standalone wireless AP solution is being installed into the campus infrastructure. The access points appear to boot correctly, however, wireless clients are not obtaining correct access. You verify that the local switch configuration connected to the access point appears as the following:  interface ethernet 0/1  switchport access vlan 10  switchport mode access  spanning-tree portfast  mls qos trust dscp  What is the most likely issue causing the problem?()
A. QoS trust should not be configured on a port attached to a standalone AP.
B. QoS trust for switchport mode access should be defined as "cos".
C. switchport mode should be defined as "trunk" with respective QoS.
D. switchport access vlan should be defined as "1".
[单项选择]英译汉:“issuing bank;negotiating bank;opening bank”,正确的翻译为( )
A. 开证行;开户银行;议付银行
B. 议付银行;开证行;开户银行
C. 开证行;议付银行;开户银行
D. 开户银行;开户银行;议付银行

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码