更多"We should not look down() the poor "的相关试题:
[单项选择]()should be used during the poor visibility if the radar’s screen shows heavy sea returns.
A. Gain Control
B. Brilliant Control
C. Anti-clutter Sea Control
D. Sweep Intercept
[单项选择]If a victim is unconscious,you should first look for evidence of().
A. high fever
B. head injury
C. broken limbs
D. irregular breathing
[简答题]Why should we teach pronunciation and intonation in context?
[单项选择]We()the cook because her cooking was so poor.
A. dismissed
B. deserted
C. resigned
D. withdrew
[单项选择]Air compressor receivers should be “blown down” at least ().
A. yearly
B. quarterly
C. monthly
D. daily
[单项选择]We should not be()towards our comrades
A. cold
B. friendly
C. kind
[单项选择]
We should apply for annual spare parts according to()
Ⅰ.he need of annual overhaul
Ⅱ.he storage of spare parts
Ⅲ.he storage capacity of spare parts room
A. Ⅰ
B. Ⅱ
C. Ⅰ+Ⅱ
D. Ⅲ
[单项选择]A look-out should report objects sighted using().
A. true bearings
B. magnetic bearings
C. gyro bearings
D. relative bearings
[单项选择]Before being shut down, a diesel engine should idle a few minutes in orderto ()
A. prevent governor surging at shutdown
B. make sure the fuel nozzles are flushed clean
C. prevent pressure buildup in the fuel lines
D. prevent damage from localized overheating
[单项选择]When we have agreed broadly on what should be said, the secretary will produce a preliminary ()for the committee's approval.
A. project
B. design
C. draft
D. drawing
[单项选择]Time is money! We should()our time.
A. be fit for
B. make good use of
C. play a part of
D. take the place of
[单项选择]()all we should put the theory into practice.
A. Beside
B. To
C. Above
D. Of
[单项选择]When replacing a part with a spare one, we should fill in tile spare parts consume table in time and make a mark in brief for ()
A. the reason of replacing
B. the course of replacing
C. crews who do this work
D. where and when the replacing being done
[单项选择]After the engine is warned, we should() the turning gear before starting up the engine.
A. take in
B. put in
C. take out
D. put up
[单项选择]When arranging cargo for()in the holds,we should give first consideration to ship’s seaworthiness and her being in a good sea-going trim after loading.
A. dunnage
B. separation
C. stowage
D. operation
[单项选择]Shall we sit up here on the grass or down there near the water? ()
A. I'd rather stay here if you don't mind.
B. Sorry, I don't like neither.
C. Certainly, why not?
D. Yes, we like these two places.
[单项选择]Increased internal leakage, in addition to poor hydraulic system response,and inadequate lubrication, is the result of ().
A. pump bearings in poor condition
B. excessively worn actuator-piston packing
C. broken directional control valve centering springs
D. low hydraulic oil viscosity
[单项选择]Poor quality fuel being used in a turbocharged medium-speed, diesel engine could result in ()
A. hard starting
B. excessive fuel consumption
C. loss of power
D. all of the above