题目详情
当前位置:首页 > 职业技能鉴定考试 > 航海英语
题目详情:
发布时间:2024-02-14 00:07:23

[单项选择]Which statement comparing a shipboard crane to conventional gear is TRUE().
A. Cranes are more difficult to secure for sea
B. The spotting area of the conventional gear is larger
C. A crane operator requires more training than the winch operator of a yard and stay rig
D. The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes

更多"Which statement comparing a shipboa"的相关试题:

[单项选择]Which statement is TRUE when comparing cold and warm fronts?()
A. Cold fronts are more violent and of shorter duration
B. Cold fronts are milder and last longer
C. They are very similar with the exception of wind direction
D. Warm fronts are more violent and of longer duration
[单项选择]Which shipboard equipment will detect a signal from a SART?()
A. S-Band Radar
B. A DSC receiver
C. X-Band Radar
D. The autoalarm
[单项选择]Which is a mandatory section of the shipboard Oil Pollution Emergency Plan().
A. Reporting requirements
B. Removal equipment list
C. Planned exercises
D. List of individuals required to respond
[单项选择]Which is NOT a mandatory part of the shipboard Oil Pollution Emergency Plan?()
A. Reporting requirements
B. Diagrams
C. Steps to control a discharge
D. National and local coordination
[单项选择]A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a().
A. yearly inspection
B. quarterly inspection
C. monthly inspection
D. weekly inspection
[单项选择]Which action(s)is/are included in crane operations().
A. Normal boom stowage and shutdown operations
B. Emergency shutdown operation
C. Removing booms from stowage
D. All of the above
[单项选择]Which statement(s) is/are TRUE concerning crane cargo operations? ()
A. Do not exceed rated load capacity of crane and container spreader or slings
B. During any cargo handling operation,the safety of personnel is paramount
C. Cargo handlers must be outfitted with adequate protection from personal injury
D. All the above
[单项选择]Which system(s) in the hydraulic systems of crane always hold(s) single side of load?()
A. hoisting system only
B. hoisting system and luffing system
C. hoisting system and slew and slewing system
D. slewing system only
[单项选择]Which action(s) is/are included in crane operations?()
A. Normal boom stowage and shutdown operations
B. Emergency shutdown operation
C. Removing booms from stowage
D. All of the above
[单项选择]Which of the fluids listed is normally used to condense the primary refrigerant in a shipboard central air conditioning system?()
A. Air or Nitrogen
B. Seawater or Fresh water
C. Sodium Nitrate brine
D. Calcium Sulfate brine
[单项选择]Accidental grounds in a shipboard electrical system must be repaired as soon as possible as they will ()
A. result in immediate power outages
B. damage circuit breakers
C. appear on the ground detection system
D. damage insulation and may cause outages
[单项选择]Shipboard Emergency Drills must be carried out at least()on board cargo ship.
A. Once every third year
B. Once a month
C. Once a year
D. Once a week
[单项选择]The approval period for a shipboard Oil Pollution Emergency Plan expires after().
A. two years
B. three years
C. four years
D. five years
[单项选择]Shipboard Oil Pollution Emergency Plans must be reviewed().
A. annually by the owner,with a letter submitted six months before expiration
B. only once every five years,with a letter submitted six months before expiration
C. and the entire plan resubmitted for approval once every five years,six months before expiration
D. annually by the owner,with a letter submitted to the Coast Guard within one month of the anniversary date of the plan approval
[单项选择]Coast Guard regulations require a shipboard Oil Pollution Emergency Plan to be reviewed().
A. annually
B. once every two years
C. once every four years
D. once every five years
[单项选择]The approval period for a shipboard oil pollution emergency plan expires after ().
A. one year
B. two years
C. four years
D. five years
[单项选择]A shipboard Oil Pollution Emergency Plan is required of().
A. all vessels,regardless of size and commercial application
B. any barge or ship constructed or operated in such a manner that no oil in any form can be carried aboard
C. an oil tanker of 150 gross tons and above,or other ship of 400 gross tons and above
D. an oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码