题目详情
当前位置:首页 > 职业技能鉴定考试 > 航海英语
题目详情:
发布时间:2024-03-04 07:11:51

[单项选择]In a transversely framed ship,the transverse frames are supported by all of the following EXCEPT().
A. girders
B. longitudinals
C. side stringers
D. web plates

更多"In a transversely framed ship,the t"的相关试题:

[单项选择]The deck beam brackets of a transversely framed vessel resist().
A. hogging stresses
B. sagging stresses
C. racking stresses
D. shearing stresses
[单项选择]In a longitudinally-framed ship,the longitudinal frames are held in place and supported by athwartship members called().
A. floors
B. margin plates
C. stringers
D. web frames
[单项选择]A ship having continuous closely spaced transverse strength members is().
A. longitudinally framed
B. transversely framed
C. cellular framed
D. web framed
[单项选择]Transverse frames are more widely spaced on a ship that is designed with the().
A. centerline system of framing
B. isometric system of framing
C. longitudinal system of framing
D. transverse system of framing
[单项选择]The decks of a ship are supported by transverse members called().
A. trusses
B. deck longitudinals
C. deck beams
D. web frames
[单项选择]In ship construction,frame spacing is().
A. greater at the bow and stern
B. reduced at the bow and stern
C. uniform over the length of the vessel
D. uniform over the length of the vessel,with the exception of the machinery spaces,where it is reduced due to increased stresses
[单项选择]When liquid is free to move transversely in a tank,the effect is called().
A. free communication
B. free density
C. free surface
D. negative GM
[单项选择]Longitudinal and transverse separtions between the tanks,which are used to prevent liquids from leaking from one double bottom tank into the other ,are called().
A. double bottoms
B. cofferdam
C. navigating bridge
D. superstructure
[单项选择]Transverse stability calculations require the use of().
A. hog or sag calculations or tables
B. hydrostatic curves
C. general arrangement plans
D. cross-sectional views of the vessel
[单项选择]Assuming an even transverse distribution of weight in a vessel,which condition could cause a list?().
A. Empty double-bottoms and lower holds,and a heavy deck cargo
B. Flooding the forepeak to correct the vessel's trim
C. Having KG smaller than KM
D. Having a small positive righting arm
[单项选择]Horizontal transverse motion of a vessel is known as().
A. pitch
B. surge
C. sway
D. heave
[单项选择]In vessel construction,beams are transverse girders which provide support to().
A. bulkheads
B. deckhouse structures
C. decks
D. vertical frames
[单项选择]Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
A. Guy
B. Shroud
C. Spider
D. Topping lift
[单项选择]Channel 13 is primarily used for ship to ship communication. Channel 13 is also authorized for().
A. coast to aircraft operational communications
B. aircraft to ship operational communications
C. lock & bridge communications
D. aircraft to ship navigational communications
[单项选择]Ship-to-ship distress alerting should be conducted by().
A. Inmarsat SES
B. VHF/DSC or MF/DSC
C. SART and VHF/DSC
D. Satellite EPIRB and VHF/DSC

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码