更多"If there is sufficient sea room,alt"的相关试题:
[单项选择]An emergence sea anchor may be constructed by type of extinguisher?().
A. a boat bucket
B. an air tank filled with water
C. an oar and canvas weighted down
D. All of the above
[单项选择]An emergency sea anchor may be constructed by using().
A. a boat bucket
B. an air tank filled with water
C. an oar and canvas weighted down
D. All of the above
[单项选择]A SEA ROOM TO BE KEPT FOR SAFETY AROUND A VESSEL,ROCK,PLATFORM,ETC.,OR THE PLACE ASSIGNED TO A VESSEL WHEN ANCHORED OR LYING ALONGSIDE A PIER,ETC means().
A. Port
B. Commercial area
C. Berth
D. Roadstead
[单项选择]Any alteration of course and/or speed to avoid collision shall,if the circumstances of the case admit,()to another vessel observing visually or by radar.
A. be large enough to be readily apparent
B. be a succession of small alterations
C. be with due regard to the power and speed of the vessel
D. leave sufficient room for the other vessel to take action
[单项选择]If the circumstances admit,()of small alteration of course and speed shall not be taken to avoid collision.
A. depression
B. oppression
C. succession
D. possession
[单项选择]Sea Waybill与Bill of Lading的不同之处在于Sea Waybill不是()
A. 领取货物的凭证
B. 运输契约
C. 可流通的有价证券
[单项选择]()will normally provide sufficient information to seaward of fairway buoy or pilot station.
A. Navarea warnings
B. coastal warnings
C. local warnings
D. Meteorological warnings
[单项选择]The SART should have sufficient battery capacity to operate in the stand-by condition for()hours and should continuously work for()hours.
A. 120/20
B. 56/18
C. 100/16
D. 96/8
[单项选择]It is apparent that there was not sufficient depth of water()and I claim that the estimated arrival draft as radioed to the agent to report to you was a close one.
A. for my vessel crossing safely
B. my vessel is to cross safely
C. for my vessel to cross safely
D. for my vessel's crossing safely
[单项选择]To safely anchor a vessel there must be sufficient scope in the anchor cable. Scope is the ratio of().
A. weight of cable to weight of vessel
B. weight of cable to weight of anchor
C. length of anchor to depth of water
D. length of cable to depth of water
[单项选择]“The engine not obtaining the sufficient speed for firing” means that ().
A. the start fails
B. the fuel pumps will be put into operation
C. the fuel valves are damaged
D. the combustion process will take over
[单项选择]A sufficient amount of chain must be veered when anchoring a vessel to ensure().
A. the vessel has enough room to swing while at anchor
B. the anchor flukes bite into the ocean bottom
C. there is a sufficient scope of chain to keep the anchor on the bottom
D. there is more chain out than there is in the chain locker
[单项选择]Sufficient cargo tanks shall be()prior to each ballast voyage in order that,taking into account the tanker’s trading pattern and expected weather conditions,ballast water is put only into cargo tanks which have been crude oil washed.
A. Inerted
B. Crude oil washed
C. Gas freed
D. Battened down
[单项选择]There is sufficient anchorage for()at all time around the No.1 buoy and for smaller vessels around the No.4 buoy.
A. deep laded vessels
B. deeply load vessels
C. deep loading vessels
D. deeply loaded vessels
[单项选择]The () of the lubricant should be sufficient to hold the film together, but it should allow the lubricant to flow easily.
A. specific gravity
B. viscosity
C. acid value
D. calorific value