题目详情
当前位置:首页 > 职业技能鉴定考试 > 航海英语
题目详情:
发布时间:2023-10-10 08:56:12

[单项选择]The Shipowner must not stow goods on deck()there is a trade usage to that effect or the Charterer has given his express or implied consent.
A. whether
B. if
C. unless
D. that

更多"The Shipowner must not stow goods o"的相关试题:

[单项选择]The Shipowner must not stow goods on deck()there is a trade usage to that effect or the Charterer has given his express or implied consent.
A. whether
B. if
C. unless
D. that
[单项选择]Master must ascertain that deck loads are stowed in such a manner as().
A. not to affect the vessel's stability and trim
B. to affect the vessel's stability
C. to affect the vessel's trim
D. to affect the vessel's atability or trim
[单项选择]Mariners must ascertain that deck loads are stowed in such a manner as().
A. to affect the vessel's stability
B. not to affect the vessel's stability
C. to keep the vessel on even keel
D. not to keep the vessel on even keel
[单项选择]Unless the Shipowner carries the goods to the destination agreed on,he()entitled to anypart of the freight.
A. is
B. has
C. is not
D. has not
[单项选择]The Chief Mate must ascertain that the deck loads are stowed in such a manner as().
A. not to affect the draught trim
B. not to affect the cargo ventilation
C. not to affect the free surface
D. not to affect the vessel's stability
[单项选择]Which of the following precautions must be taken if an electric immersion heater is used to keep the coolant in a diesel engine warm during the time the engine is secured?()
A. The coolant temperature must be maintained at 180℃
B. The thermostatic bypass valves must be manually opened before the engine is started
C. The pressure cap must be removed while the engine is secured
D. Electrical power to the heater must be secured before the cooling system is drained
[单项选择]The helicopter deck of a ship must be marked with the units identification,appropriate aiming circles,and a continuous line on the perimeter which is().
A. 8 inches wide
B. 16 inches wide
C. 24 inches wide
D. 32 inches wide
[单项选择]You must shift a weight from the upper tween deck to the lower hold. This shift will().
A. make the vessel more tender
B. make the vessel stiffer
C. increase the rolling period
D. decrease the metacentric height
[单项选择]

The appearance of the island when I came on deck next morning was altogether changed. Although the breeze had now utterly failed, we had made a great deal of way during the night, and were now lying becalmed about half a mile to the southeast of the low western coast. Grey-colored woods covered a large part of the surface. ③This even tint was indeed broken up by streaks of yellow sandbreak in the lower lands, and by many tall trees of the pine family, out-topping the others — some singly, some in clumps, but the general coloring was uniform and sad. ④The hills ran up clear above the vegetation in spires of naked rock. All were strangely shaped, and the Spy Glass, which was by three or four hundred feet the tallest on the island, was likewise the strangest in configuration, running up sheer from almost every side, ⑤and then suddenly cut off at the top like a pedestal to put a statue on.

文中③段画线部分翻译正确的是()。
A. 这种平均的色彩确实被一条条的黄沙在低地打破
B. 这种素净的色彩诚然也杂有一条条带状的黄沙低地
C. 这种均匀的色彩也确实被一条条黄沙在低地被隔断
[单项选择]A vessel engaged in fishing must display a light in the direction of any gear that extends outward more than 150 meters. The color of this light is().
A. white
B. green
C. red
D. yellow
[单项选择]I’ve already put down the remarks deck cargo()shipper’s risk in the shipping order.
A. in
B. on
C. at
D. for
[单项选择]I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
A. IN
B. ON
C. AT
D. FOR
[单项选择]I saw the cargo surveyor()the cargo on deck just a minute ago.
A. examine
B. to examine
C. being examined
D. examining
[单项选择]The type of davit on which you must turn a crank in order to swing the lifeboat out over the ship’s side is a().
A. sheath-screw davit
B. gravity davit
C. radial davit
D. bruckner davit
[单项选择]Must I do the washing-up tonight?()
A. No, you mustn‘t if you don‘t want.
B. Leave it if you‘re exhausted.
C. Washing-up is really exhausting.
D. Washing-up really takes up time.
[单项选择]A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().
A. Exemption space
B. Tonnage deck
C. Cofferdam
D. Tonnage opening
[单项选择]The()is the intermediate deck between upper deck and the inside bottom of the vessel.
A. forcastle
B. tweendeck
C. hatches
D. peak tanks

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码