题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2024-04-06 22:39:15

[单选题]The development process in the software ______ involves four phases: analysis, design, implementation, and testing.
A.maintenance]
B.1ife] cycle]
C.programming
D.upgrading

更多"[单选题]The development process in the"的相关试题:

[单选题]The development process in the software______involves four phases:analysis,design,implementation,and testing.
A.maintenance
B.1ife cycle
C.programming
D.upgrading
[单选题]The process of software development doesn’t include( ).
A.verification function
B.writing code
C.management function
D.validation function
[单选题]软件过程改进(Software Process Improvement,SPI)是帮助软件企业对其软件(制作)过程的改变(进)进行计划、实施的过程,根据相关标准,软件过程改进一般从 ( ) 开始。
A.计划变更
B.领导建议
C.问题分析
D.知识创新
[单选题]The process whereby software is installed into an operational environment is called ” ( ) ".
A.deployment
B.development
C.setup
D.lay up
[单选题]The spiral model is a software development model combining elements of both ( ) and prototyping-in-stages, so it's a healthy mix of top-down and bottom-up concepts。
A.design
B.progam
C.coding
D.plan
[简答题]论软件开发模型及应用 软件开发模型(Software Development Model)是指软件开发全部过程、活动和任务的结构框架。软件开发过程包括需求、设计、编码和测试等阶段,有时也包括维护阶段。软件开发模型能清晰、直观地表达软件开发全过程,明确规定了要完成的主要任务和活动,用来作为软件项目工作的基础。对于不同的软件项目,针对应用需求、项目复杂程度、规模等不同要求,可以采用不同的开发模型,并采用相应的人员组织策略、管理方法、工具和环境。 请围绕“软件开发模型及应用”论题,依次从以下三个方面进行论述。 1.简要叙述你参与的软件开发项目以及你所承担的主要工作。 2.列举出几种典型的软件开发模型,并概要论述每种软件开发模型的主要思想和技术特点。 3.根据你所参与的项目中使用的软件开发模型,具体阐述使用方法和实施效果。
[单选题]The()process differs from the()process in that the former is primarily concerned with acceptance of the deliverables,while the latter is primarily concerned with acceptance of the deliverables,while the latter is primarily concerned with correctness of the deliverables.
A.perform Quality Assurance
B.Validate Scope
C.Control Quality
D.Define Scope
[单选题]Software ( )refers to that the software to meet the specification must be produced.
A.test
B.support
C.development
D.process
[单选题]Software( )refers to that the software to meet the specification must be produced.
A.test
B.support
C.development
D.process
[单选题]The perform Integrated Change Contorl process is the uitimste responsbilityof the(请作答此空),Although changes my be intitated verbally,y they should be recorded in writtern form and entered into the( )syste.
A.resource sanager
B.division sanager
C.functional manager
D.projeet manager
[单选题]Development is a structured design methodology that proceeds in a sequence from one phase to the next.
A.Waterfall
B.Phased
C.Prototyping
D.Parallel
[单选题]Which of the following describes the process in which one’s language ability is developed in natural and everyday situation?
A.Performance
B.Competence
C.Learning
D.Acquisition
[单选题]In the process of communication requirement analysis,the project manager should consider the number of potential communication channels or paths as an indicator of the complexity of a project’s communications. According to Metcalfe’s Law,a project with 10 stakeholders has ( ) potential communication channels.
A.10
B.45
C.50
D.100
[单选题]The Develop Project Management Plan Process includes the actions necessary to define, prepare,integrate, and coordinate all constituent plans into a ( )
A.Project Scope Statement
B.Project Management Plan
C.Forecasts
D.Project Charter

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码