更多"[单选题]( )S1:Check reefer holds "的相关试题:
[单选题]( )S1:Check reefer holds for proper loading preparation and report. S2:Reefer holds ready for loading. Q: What should be checked?
A.reefer plugs
B.reefer holds
C.cargo securings
D.hold ventilators
[单选题]( )S1: Are the holds clean? S2: Yes, the holds are clean. Q: What’ s the state of the holds?
A.free of smell
B.free of dirt
C.clear
D.dry
[单选题]( )S1:Are the holds free of smell? S2:The holds will befree of smell in 15 minutes. Q:What’s the present state of the holds?
A.free of smell
B.free of dirt
C.Still smelling
D.still wet
[单选题]( )S1:You should have all cargo holds fumigated, except those completely loaded with machinery. S2:Yes, Sir. I’ll prepare for fumigation. Q:Which of the following statements is true?
A.All cargo holds except those with bulk cargo should be disinfected
B.All cargo holds except those full of machinery should be disinfected
C.All cargo holds except those loaded with general cargo should be disinfected
D.All cargo holds except those full of liquid cargo should be disinfected
[单选题]S1:Now let s check if the vessel is prepared for loading. S2:Yes, Sir. S1:Is cargo
List available and complete? S2:Yes, cargo list available and complete. S1:Are holds clean?
S2:Yes, they are swept clean. S1:Are safety arrangements in holds operational? S2:Yes, safety arrangements in holds operational. S1:Good. Are sufficient dunnage and mats available? S2:Yes,sufficient dunnage and mats are available. S1:OK. Fill double bottom tanks before loading heavy lifts. 1 : Which of the following is not mentioned in the dialogue?
A. cargo list.
B.safety arrangements.
C. hatch covers.
D. dunnaging material.
[单选题]( )S1: What is the safe working load of the ship cranes? S2: It is 35 tons each. Q: What are the speakers talking about?
A.The safe working load of the ship ’ s derricks
B.The safe working load of the shore derricks
C.The safe working load of the ship’s cranes
D.The safe working load of the shore cranes
[单选题]( )S1:What is the safe load of No. 2 hold? S2:The safety load of No. 2 hold is 3 tons per square meter. Q:What are they talking about?
A.The cargo quantity of No. 2 hold
B.The cargo measurement of No. 2 hold
C.The safety loading of No. 2 hold
D.The safety loading rate of No. 2 hold
[单选题]( )S1: Check operation of hold ventilators and report. S2: Hold ventilators in No. 2 hold not in operation. Q: What is not in operation?
A.Reefer plugs
B.Reefer holds
C.No. 2 hold
D.Hold ventilators
[单选题]( )S1: Check the anchor position by bearing. S2:The anchor position is bearing 087 degrees 2 miles from No. 2 buoy. Q:How is the anchor position to be checked?
A.by GPS
B.by bearings
C.by astronomical observation
D.by fixings
[单选题]( )S1: Check the hatch covers for damage and report. S2:The hatch covers are in good order. Q:What does the first speaker want to know?
A.The damage to the hatch covers
B.The damage to the hatch coamings
C.The state of the hatch covers
D.The state of the hatch coamings