题目详情
题目详情:
发布时间:2024-07-28 21:17:55

[单项选择]

Many of the activities performed during the preliminary investigation are still being conducted in (1) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3) and the existing systems to enable an effective solution to be proposed and implementeD. Besides the (4) for process and data of current system, the deliverable from this phase also includes the (5) for the proposed system.

2()
A. main symptom
B. root problem
C. final blueprint
D. data specification

更多"Many of the activities performed du"的相关试题:

[单项选择]

Many of the activities performed during the preliminary investigation are still being conducted in (1) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3) and the existing systems to enable an effective solution to be proposed and implementeD. Besides the (4) for process and data of current system, the deliverable from this phase also includes the (5) for the proposed system.

1()
A. analysis phase
B. design phase
C. implementation phase
D. maintenance phase
[单项选择]All of the following must be performed during project initiating EXCEPT ().
A. identify and document business needs
B. create a project scope statement
C. divide large projects into phases
D. accumulate and evaluate historical information
[单项选择]During the famine many people ()eating grass and leaves.
A. felt inclined to
B. were confronted with
C. got accustomed to
D. were reduced to
[单项选择]During execution of a project which is performed for a customer on a T & M (time and material)contract base, a new project manager is taking over the assignment. He discovers that two members assigned to the project have charged time without performing any work for the project customer. Upon further investigation, he determines that this occurred because there have been no other project assignments open for these employees. The customer is unaware of these facts. Which of the following should he do
A. Try to find some productive work for these staff members in the project and leave them on the team.
B. The best thing is to do nothing. The customer will not realize the problem anyway.
C. Try to find a responsible person for the over-assignment who can be made accountable.
D. Take the two people off the team immediately and arrange for the refund of the excess charges to the customer.

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

截图扫码使用小程序[完全免费查看答案]
请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码