更多"In the Grammar-Translation Method, "的相关试题:
[单项选择]In the Grammar-Translation Method, the teaching materials are arranged according to a () system.
A. language
B. content
C. logic
D. grammar
[单项选择]This teaching method is a ( ) of many methods which have been used for decades in the country.
A. symposium
B. symphony
C. spectrogram
D. synthesis
[单项选择]This teaching method is a ______ of many methods which have been used for decades in the country.
A. symposium
B. symphony
C. spectrogram
D. synthesis
[简答题]介绍某个学校IT学院引入了新的模式。
(computer teaching) method
[单项选择]Lecturing as a method of teaching is so frequently under attack today from educational psychologists and by students that some justification (理由) is needed to retain it. Critics believe that it results in (47) methods of learning which tend to be less effective than those which fully engage the learner. They also (48) that students have no opportunity to ask questions and must all receive the same content at the same pace, that they are exposed only to one teacher’’s interpretation of subject matter which will inevitably be prejudiced and that, anyway, few lectures rise above (49) . Nevertheless, in a number of inquiries this (50) assessment of lecturing as a teaching method proves not to be general among students, although they do fairly often comment on poor lecturing techniques.
Students (51) lectures which are clear, orderly summary in which basic principles are emphasized, but dislike too (52) digressions (离题) or lectures which consist in part of the contents of a
[单项选择]The Audiolingual Method is a method of foreign or second language teaching which emphasizes the ().
A. listening and reading before speaking and writing
B. listening and speaking before reading and writing
C. listening and speaking before translating and writing
D. reading and writing before listening and speaking
[简答题]女生选中国历史课和她的teaching课冲突, 中国历史只有这学期有,自己想到换teaching的课,教高年级学生。
[单项选择]Precedence Diagramming Method (PDM) is a method used in activity sequencing.There are four types of dependencies or precedence relationships in PDM.The initiation of thesuccessor activity depends upon the completion of the predecessor activity is called ______.
A. Finish-to-Start
B. Finish-to-Finish
C. Start-to-Start
D. Start-to-Finish