There are two basic ways to see growth: one as a product, the other as a process. People have generally viewed personal growth as an external result or product that can easily be identified and measured. The worker who gets a promotion, the student whose grades improve, the foreigner who learns a new language - all these are examples of people who have measurable results to show for their efforts. By contrast, the process of personal growth is much more difficult to determine, since by definition it is a journey and not the specific signposts or landmarks(路标) along the way. The process is not the road itself, but rather the attitudes and feelings people have, their caution or courage, as they encounter new experiences and unexpected obstacles(障碍). In this process, the journey never really ends; there are al A. he has given up his smoking habit B. he has made great efforts in his work C. he is interested in making anything new D. he has tried to determine where he is on his journey [单项选择]根据公司法的规定,有限责任公司全体股东的货币出资金额不得低于注册资本的( )。
A. 20% B. 30% C. 35% D. 70% [填空题]现场组装套管井常规测试管柱时应用()mm管钳紧扣,并应满足规定的扭矩。
[单项选择]单横担的组装位置,分支杆、转角杆、终端杆应装于()侧。
A. 电源 B. 负荷 C. 拉线 D. 三者均可 [简答题] 某电厂2×600
MW燃煤发电机组建设项目包括锅炉、汽轮机和发电机,配套工程有:新建1个5万t级煤码头泊位、2个贮煤场,煤由产地运至电厂码头,通过卸煤机、带式输送机、煤堆场、取煤机送至锅炉。供水系统采用直接海水冷却,取海水158300m3统取水610m3/h,淡水取自厂北部的水库。每台机组配套2台双室电厂静电除尘器,并配有脱硫装置,采用低氮燃烧器。设置工业废水集中处理站、含油废水处理系统、煤场污水沉淀系统和生活污水处理系统。固废采用灰渣分除、干灰干排、粗细分排系统,干灰直接综合利用,调湿后的灰和脱水后的渣进行综合利用或送至灰场。验收监测时1#和2#机组的生产负荷分别为455.55~467.01MW和552.18~565.30
MW,额定功率均为600 MW。1#和2#机组的除尘、脱硫、脱氮验收监测数据如表5所示。
|