Until the very latest moment of his existence, man has been bound to the planet on which he originated and developed. Now he had the capability to leave that planet and move out into the universe S1.() to those worlds which he has known previously only directly. Men S2.()have explored parts of the moon, put spaceships in orbit around another planet and possibly within the decade will land into another planet S3.() and explore it. Can we be too bold as to suggest that we may be S4.() able to colonize other planet within the not-too-distant future S5.() Some have advocated such a procedure as a solution to the population problem: ship the excess people off to the moon. But we must keep in head the billions of dollars we might spend in carrying out the project. S6.() To maintain the earth’s population at its present level, we would have to blast off into space 7,500 people every hour of every day of the year.
Why are we spending so little money on space exploration S7.
患儿女性,生后1周出现腹胀、瞌睡并出现轻度黄疸,伴呕吐胆汁样物,腹泻黏液血便。查体:腹胀明显,肠鸣音弱。诊断考虑:新生儿急性坏死性小肠炎。 |
某工程项目,建设单位通过公开招标方式确定某施工单位为中标人,双方签订了工程承包合同,合同工期为3个月。
合同中有关工程价款及其支付的条款如下:
(1)分项工程清单中含有两个分项工程,工程量分别为甲项4500m3,乙项31000m3,清单报价中,甲项综合单位为200元/m3,乙项综合单价为12.93元/m3,乙项综合单价的单价分
析表见表6。当某一分项工程实际工程量比清单工程量增加超出10%时,应调整单价,超出部分的单价调整系数为0.9;当某一分项工程实际工程量比清单工程量减少10%以上时,对该分项工程的全部工程量调整单价,单价调整系数为1.1。
(2)措施项目清单共有7个项目,其中环境保护等三项措施费用4.5万元,这三项措施费用以分部分项工程量清单计价合计为基数进行结算。剩余的四项措施费用共计16万元,一次性包死,不得调价。全部措施项目费在开工后的第1个月末和第2个月末按措施项目清单中的数额分两次平均支付,环境保护措施等三项费用调整部分在最后一个月结清,多退少补。
(3)其他项目清单中只包括招标人预留金5万元,实际施工中用于处理变更洽商,最后一个月结算。
(4)规费综合费率为4.89%,其取费基数为分部分项工程量清单计价合计、措施项目清单计价合计、其他项目清单计价合计之和;税金的税率为3.47%。
(5)工程预付款为签约合同价款的10%,在开工前支付,开工后的前两个月平均扣除。
(6)该项工程的质量保证金为签约合同价款的3%,自第1个月起,从承包商的进度款中,按3%的比例扣留。
合同工期内,承包商每月实际完成并经工程师签证确认的工程量见表7。
表6 (乙项工程)工程量清单综合单价分析表(部分) (单位:元/m 我来回答: |