Black and white are two common words.
White means bright and purity, black is darkness and evil, but not always.
Sometimes the words are used differently. White hats and black hats represent
the traditional meaning of the words. The hats are symbols of the good guys and
the bad guys in American western movements. White hats and black hats had a real
purpose in the early days of motion pictures. The early movies were made with no
sounds. So the movie directors put a white hat on the hero and a black hat on
his opponent, the bad guy in the story. A black sheep is a person who does
things that are not accepted, that violate tradition. A black sheep is rejected
because he brings shame to his group. A family may have a member who is thought
of as a black sheep, a person who is not welcome at family gatherings. Black is also used i A. good and bad. B. profit and loss. C. right and wrong. D. positive and negative. [单选题]各厂生产的氟离子选择性电极的性能指标不同,均以 KF-,Cl-表示。若被测溶液中Cl-的活度为F-活度的比值当小于100倍时,要使干扰小于0.1%,应选用下面( )种。
A.44109 B.44108 C.44107 D.44106 [不定项选择题]社区口腔健康咨询中群众提出了不少问题,口腔预防保健人员进行了认真分析,准备进行宣传教育活动
在老年人中提倡
A.叩齿 B.刷牙 C.健康的牙齿伴终生 D.人老牙越好 E.义齿恢复口腔功能 [判断题]简述人工除锈方法及步骤:人工除锈是用刮刀,敲锈锤、钢刮铲、钢凿子等除去失效漆膜及钢材锈蚀部分,再用钢丝刷、砂布清除残留的氧化皮、锈蚀,香蕉水等溶剂清擦洗,最后用清洁布擦干净钢材表面。
A.正确 B.错误 [简答题]
某系统集成企业承接了一个环保监测系统项目,为某市的环保局建设水污染自动监测系统。该企业以往的主要业务领域为视频监控及信号分析处理,对自动控制系统也有较强的技术能力,但从未在环保领域开发应用。该企业的老李被任命为此项目的项目经理。 该企业已按照ISO9001的要求建立了一套质量管理体系,对于项目管理、软件开发等的流程均有明确的书面规定。但公司中很多人认为这套管理体 系的要求对于项目来说是多余的,条条框框的约束太多,大部分项目经理都是在项目结项前才把质量体系要求的文档补齐以便能通过结项审批。公司的质量管理员也 习以为常,只要在项目结束前能把文档补齐,就不会干涉项目建设。 老李组织了技术骨干对客户的需求进行了调研,通过对用户需求的分析和整理,项目组直接制定了一个总体的技术方案,然后老李制定了一个较粗略的项 目计划: [判断题]防洪物资须定期进行检查,检查周期为每半年一次。
A.正确 B.错误 [多选题]电力电缆工作前应详细核对()的名称是否与工作票相符,()正确可靠后,方可开始工作。
A.电缆标志牌 B.线路标志牌 C.安全措施 D.组织措施 [判断题]使用风动车卸砟时,卸砟运行速度应控制在8~15km/h。( )
A.正确 B.错误 [判断题]所有的巡视工作必须按照规定的巡视周期进行( )。
A.正确 B.错误 我来回答: 提交
|