Please Fasten Your Seatbelts{{/B}} Severe turbulence (湍流) can kill aircraft passengers. Now, in test flights over the Rocky Mountains, NASA (美国航空航天局) engineers have successfully detected clear-air turbulence up to 10 seconds before an aircraft hits it. Clear-air turbulence often catches pilots by surprise. Invisible to radar, it is difficult to forecast and can hurl (用力抛出去) passengers about the cabin. In December 1997, one passenger died and a hundred others were injured when unexpected rough air caused a United Airlines flight over the Pacific to drop 300 metres in a few seconds. However, passengers can avoid serious injury by fastening their seatbelts. "It is the only antidote (对策) for this sort of thing," says Rod Bogue, project manager at NASA’s Dryden Flight Research Center in Edwards, Cal A. A not very rough storm. B. Unexpected disturbed air. C. A kind of visible storm. D. A storm over mountain ridges. [判断题]一般说来,电缆绝缘电阻系数随温度和电场强度的上升而下降。
A.正确 B.错误 [单选题]工程费用不包括( )。
A.设备及工器具购置费 B.建筑工程费 C.安装工程费 D.土地使用费 [简答题]背景资料:
A路桥公司承担一座8×30m的C40预应力混凝土简支T形梁桥的施工。桥位地质为较密实的土层且无地下水,基础采用人工挖孔灌注桩。由于工期较紧,A公司经业主和监理同意,将挖孔桩施工分包给某基础工程施工公司(B公司),双方签订了分包合同,合同中规定了双方在安全生产管理方面的权利和义务。B公司在桩基开挖工程中发现现场地质条件与设计图纸不符,B公司直接向监理单位提交了变更申请,要求加深桩基。
A公司利用桥台附近的一块空地布设混凝土搅拌站、钢筋加工房以及T梁预制场,采用后张法进行T梁预制。在预制施工中,A公司制订了严格的施工技术方案,现对部分施工要点摘录如下:
(1)台座上铺钢板底模,预制台座均按规定设置反拱。
(2)T梁的振捣以紧固安装在侧模上的附着式振动器为主,插入式振动器为辅。
(3)混凝土浇筑时,先浇肋板再浇翼缘。
(4)张拉时,按设计提供的应力控制千斤顶张拉油压,按理论伸长量进行校核,张拉到设计应力相应油表刻度时立即锚固。
(5)张拉过程中的断丝、滑丝数量不得超过设计规定,否则要更换钢筋或采取补救措施。
(6)压浆使用压浆泵从梁最高点开始。
为确保工程顺利进行,A公司在T梁预制场施工中投入了测量工、试验工、混凝土工、模板工、电工、起吊工、张拉工等技术工种。
问题:
1.分包工程在开工前A公司应该怎样履行哪些开工申请手续
2.逐条判断T梁预制施工组织要求的正确性,并改正错误之处。
3.B公司处理桩基变更的方式是否正确如不正确,改正错误之处。
4.补充T梁预制施工中还需要的技术工种。
[单选题]下列关于我国个人实盘外汇交易的说法正确的是:( )
A. 以利用融资杠杆 B. 须有足额外汇才能交易 C. 以做卖空交易 D. 以远期交割 [单选题]体现依法监管原则的行为包括()
Ⅰ.监管机构的设置及其监管职权的取得,必须有法律依据
Ⅱ.监管职权的行使,必须依据法律形式
Ⅲ.对违法行为的制裁,必须依据法律的明确规定
A.Ⅰ、Ⅱ B.Ⅰ、Ⅲ C.Ⅰ、Ⅱ、Ⅲ D.Ⅱ、Ⅲ [单项选择]患者,男,48岁。食积不化,脘腹胀痛,纳食不香。诊断为胃下垂,首选药物是()
A. 陈皮 B. 青皮 C. 枳实 D. 木香 E. 香附 我来回答: 提交
|