(2006年)案情:甲公司签发金额为1000万元、到期日为2006年5月30日、付款人为大满公司的汇票一张,向乙公司购买A楼房。甲乙双方同时约定:汇票承兑前,A楼房不过户。其后,甲公司以A楼房作价1000万元、丙公司以现金1000万元出资共同设立丁有限公司。某会计师事务所将未过户的A楼房作为甲公司对丁公司的出资予以验资。丁公司成立后占有使用A楼房。2005年9月,丙公司欲退出丁公司。经甲公司、丙公司协商达成协议:丙公司从丁公司取得退款1000万元后退出丁公司;但顾及公司的稳定性,丙公司仍为丁公司名义上的股东,其原持有丁公司50%的股份,名义上仍由丙公司持有40%,其余10%由丁公司总经理贾某持有,贾某暂付200万元给丙公司以获得上述10%的股权。丙公司依此协议获款后退出,据此,丁公司变更登记为:甲公司、丙公司、贾某分别持有50%、40%和10%的股权;注册资本仍为2000万元。丙公司退出后,甲公司要求丁公司为其贷款提供担保,在丙公司代表未到会、贾某反对的情况下,丁公司股东会通过了该担保议案。丁公司遂为甲公司从B银行借款500万元提供了连带责任保证担保,同时,乙公司亦将其持有的上述1000万元汇票背书转让给陈某。陈某要求丁公司提供担保,丁公司在汇票上签注:“同意担保,但A楼房应过户到本公司。”陈某向大满公司提示承兑该汇票时,大满公司在汇票上批注:“承兑,到期丁公司不垮则付款。”2006年6月5日,丁公司向法院申请破产获受理并被宣告破产。债权申报期间,陈某以汇票未获兑付为由、贾某以替丁公司代垫了200万元退股款为由向清算组申报债权,B银行也以丁公司应负担保责任为由申报债权并要求对A楼房行使优先受偿权。同时乙公司就A楼房向清算组申请行使取回权。
各债权人若在破产程序中得不到完全清偿,还可以向谁追索?他们各自应承担什么责任?
Marriage is still a popular institution in the United States, but divorce is becoming almost as "popular". Most American people get married, but at the present time, fifty percent of American marriages end up in divorce. However four out of five divorced people do not stay single. They get marriages a second time to new partners. Sociologists tell us that in the next century, most American people will many three or four times in one lifetime. Alvin Toffler, an American sociologist, calls this new social form serial marriages. In his book Future Shock, Toffler gives many reasons for this change in American marriage. In modern society, people’ s lives don’ t stay the same for very long. Americans frequently change their jobs, their homes, and their circle of friends. So the person who was a good husband or wife ten years ago is sometimes not as good ten years later. After some years of marriage, a husband or wife can feel that their lives have become v
A. difference in interests
B. difference in age
C. difference in family background
D. difference in choosing jobs
PAL
NTSC
SECAM
PAL和NTSC
To: Robert Williams, School of Architecture
From: James. Johnson
Subject: Air-conditioning Installation Costs for East Hall
Date: June 4, 2006
I am writing to inform you of the costs of installing air-conditioning for the seven offices and two studio classrooms in East Hall.
Office and Classroom Installation
Estimates were obtained from three contractors on the costs of covering the offices and classrooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the overtime labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would he necessary to handle the halls and stairways, a
我来回答: