Reading involves looking at graphic
symbols and formulating mentally the sounds and ideas they represent. Concepts
of reading have changed{{U}} (67) {{/U}}over the centuries. During the
1950s and 1960s especially, increased attention has been devoted to{{U}}
(68) {{/U}}and describing the reading process. {{U}} (69)
{{/U}}specialists agree that reading {{U}} (70) {{/U}} a complex
organization of higher mental {{U}} (71) {{/U}}, they disagree
{{U}} (72) {{/U}}the exact nature of the process. Some experts, who
regard language primarily as a code using symbols to represent sounds,
{{U}} (73) {{/U}}reading as simply the decoding of symbols to the sounds
they stand {{U}} (74) {{/U}}. These authorities {{U}} (75) {{/U}} that meaning, being concerned with thinking, must be taught independently of the decoding process. Others maintain tha A. inexplicably B. inextricably C. inexpressibly D. inexpediently [单项选择]在一般情况下,产品成本计算应当属于程序相对稳定、规范性较强,可纳入日常核算体系的成本计算,即()。
A. 常规成本计算 B. 特殊成本计算 C. 责任成本计算 D. 质量成本计算 [简答题]某公路工程路基工程施工。由于工程量无法准确确定,故施工合同规定:按施工图预算方式计价;承包方必须严格按照施工图及施工合同规定的内容及技术要求施工;工程量由计量工程师负责计量。施工过程中,在进行到设计施工图所规定的处理范围边缘时,承包方在取得旁站监理工程师认可的情况下,将夯击范围适当扩大。施工完成后,承包方将扩大的工程量向计量下程师提出了计量支付的要求,遭到拒绝。在土方开挖时,有两项重大原因使工期发生了较大的拖延。一是遇到了工程地质勘探没有探明的孤石,移除孤石拖延了一定的时间;二是施工时遇到了数天季节性的大雨,土壤含水量过大,无法进行强夯施工,耽误了部分工期。承包方就此提出了延长工期和补偿停工期间窝工损失的索赔。
问题计量工程师拒绝承包方提出的超范围强夯的工程量的计量支付是否合理为什么
2.监理工程师是否应该受理承包方提出的延长工期和费用补偿的索赔为什么
[单项选择]下列不属于(1941—1942)中共为克服敌后抗日根据地的困难而采取的措施有()。
A. 进行反"扫荡" B. 开展大生产运动 C. 开展整风运动 D. 掀起"一二•九"运动 [多选题]消防电梯应符合下列规定( )
A.应能每层停靠; B.从首层到顶层的运行时间不大于60秒; C.轿厢内部装修应采用不燃材料; D.应设置专用消防对讲电话 [判断题]噪声有可能引起抖动的产生。
A.正确 B.错误 [单项选择]Passage Five
|